
Los Angeles Civil Engineering Company
Civil Engineering & Grading Plans for Los Angeles
LA Fire Rebuilds: Altadena, Pacific Palisades & Malibu
About B+W Engineering
Civil and structural engineering you can count on since 2011
B+W Engineering is a Los Angeles civil engineering firm founded in 2011 by Brandon Lee Walter (B.S. Civil Engineering, UC Irvine) andWilson Aquino, P.E.(B.S. Structural Engineering, UC San Diego). We specialize in grading plans, drainage plans, and hydrology reports for hillside construction and post-fire rebuilds inAltadena, Pacific Palisades, and Malibu, with more than50 completed projectsacross Los Angeles.

Founded by two friends in 2011
Brandon designs the grading and drainage; Wilson, a licensed Professional Engineer, stamps the structural work. The B and the W are their initials.
First approved Altadena fire-rebuild drainage plan
Our Alta Crest Drive drainage plan was the first approved for an Eaton Fire rebuild property in Altadena, and we turn fire-rebuild plans around in about a week.
We avoid sump pumps when the lot allows it
On most Altadena hillside lots (roughly 95%), proper grading, area drains, and rain gardens carry water by gravity, so you don't pay for a pump you don't need.
Our Mission
We're here to do the job right. That means showing up on time, being honest about what can and can't be done, and treating every project big or small with the same care.
Who We Serve
We work with homeowners rebuilding after the LA fires in Altadena, Pacific Palisades, and Malibu. We also handle ADUs, apartment buildings, condos, mixed-use projects, and commercial work for developers, property owners, and real estate companies.
Call us: 323-739-3913How It Works
We make Civil Engineering simple. Here's how your project moves forward.
We Send You a Proposal
After you reach out, we put together a proposal that fits your project's scope. No surprises, no hidden fees.
You Send Us the Architect's Files
Once you're ready, your Architect sends us their drawings. We handle the Civil Engineering side.
We Design Your Grading and Drainage Plans
Our team creates the Civil Engineering plans, handling grading, drainage, and local requirements.
Plans Go Back to Your Architect
We send everything to your Architect. You just wait for approvals.
Ready to get started? Your Architect can send us files the same day.
Talk to Us About Your ProjectCommon Questions About Grading and Drainage Plans
Our Services
Projects big and small - specializing in hillside grading for single family residential throughout Los Angeles
Hillside Grading
Specialized grading for steep Los Angeles terrain. We design 2:1 slopes, retaining walls, and driveways for hillside properties in Altadena, Pacific Palisades, and Malibu.
Erosion Control Plans
Plans that show how to keep soil in place during construction. Important for hillside projects where loose dirt can wash onto neighboring properties.
Excavation Plans
Shows where we cut into slopes, shoring locations, and how the site looks in cross-section. Includes street dimensions and adjacent alley layouts.
Grading Plans
Shows your property lines, structures, topography, and how water drains across the site. Includes curbs, gutters, sidewalks, and storm drain connections.
LID
Low Impact Development uses natural systems like rain gardens and permeable surfaces to manage stormwater on your property.
Hydrology Reports
We calculate how construction changes water flow on your property. The report shows pre and post-development drainage patterns with maps and recommendations for handling stormwater.
Sump Pump Design
When gravity drainage is not possible, we design sump pump systems to move water away from your foundation and prevent flooding.
Drainage Plans
Shows how water moves across your property and where it drains. Critical for hillside homes to keep water away from foundations and prevent issues with neighbors downhill.
Our Portfolio
Civil engineering and grading projects across Los Angeles

Altadena Fire Rebuild on Laurel Drive
Altadena
Drainage plan for a Laurel Drive fire rebuild in Altadena where the existing driveway and both side yard retaining walls stay in place, with roof runoff and area drains routed to a legal outlet.

Altadena Fire Rebuild on Sunny Oaks Circle
Altadena
Drainage and grading design for an Altadena fire rebuild on a steep lot: existing walls, septic tank, mature oaks, and a 20 foot grade drop all held in place while a new house and two-story ADU go in.

Altadena Fire Rebuild on Glenrose Avenue
Altadena
Drainage plans, hydrology, and street plans for an Altadena fire rebuild: two-story house, attached ADU, 2-car garage, and pool.

Ferrari of Newport Beach Service Center
Costa Mesa
Grading plan for Ferrari and Maserati of Newport Beach in Costa Mesa: swale removal, ADA parking, and flat-grade lot for low exotic cars.

Marquez Terrace
Pacific Palisades
Grading plans, LID report, and excavation plans for a Pacific Palisades remodel: 2-story SFR with basement, existing pool stays, LID drainage to lined rain gardens.

St Lucia Avenue
Redondo Beach
Grading plans, hydrology report, and stormwater sump pump design for two connected 2-story container homes on a sloped Redondo Beach lot.
Meet the Team
The dedicated professionals behind B+W Engineering and Design
Brandon Lee Walter
Co-Founder
Brandon graduated with a B.S. in Civil Engineering, specializing in Structural Engineering, from the University of California, Irvine in 2002. His dedication to the field is evident in his deep understanding of designing and analyzing steep hillside land. The 'B' in B+W signifies Brandon's foundational role and commitment, highlighting both his expertise and the personal touch he adds to every endeavor.
Wilson Aquino, P.E.
Structural Engineering
Wilson obtained his B.S. in Structural Engineering from the University of California, San Diego in 2002. Since then, he's leveraged his expertise to contribute significantly to various structural projects, emphasizing safety and innovation. The 'W' in B+W is a nod to Wilson's foundational role, highlighting his blend of professional acumen and personal investment in each undertaking.
Areas We Serve
Expert civil engineering services throughout Los Angeles County
Latest Insights
Thoughts on grading, drainage, and LA hillside engineering

Nov 15, 2026
Altadena Fire Rebuild on Laurel Drive: Drainage Plan Around What Stays
A Laurel Drive fire rebuild in Altadena keeps the existing driveway and side yard walls. Here is how the drainage plan routes roof runoff and area drains to a legal outlet, and why county plan check asked for it.

Nov 13, 2026
Altadena Fire Rebuild Drainage: Keeping Septic, Oaks, and Walls
An Altadena rebuild had to keep its existing septic tank, driveway, walls, and protected oak trees. Here is how we routed drainage around all of it.

Sep 29, 2026
Designing a Malibu Hillside Driveway With 3D Grading Models
A vacant Malibu lot off Pacific Coast Highway sits on a 22% slope. Here's how we used 3D terrain models to fit a 15% fire access road with minimal grading.
Grading Plans That Get Approved
Whether you are adding a deck, expanding your home, or starting fresh on a vacant lot, we can handle the civil engineering. Give us a call.
For Architects & ProfessionalsOur Location
B+W Engineering and Design
1433 Foothill Boulevard, Suite 102
La Canada Flintridge, CA 91011
Email: [email protected]





