Residential on Glenhaven Avenue
Grading plans, excavation plans, and drainage plans for a Pacific Palisades fire rebuild on a 12% slope with basement and garage level construction.
Location
Pacific Palisades, CACurrent Phase
Submittal Stage
Project Overview
Grading plans, excavation plans, and drainage plans for a Pacific Palisades fire rebuild on a steep 12% slope. The street itself is steep, which required careful design for the driveway apron connection to the basement and garage finished floor. The garage and basement sit on the same level with a lightwell behind the basement.
The first story of the new house sits roughly where the existing house was, tying into the existing grade closely. But the basement level required excavation deeper into the hillside.
We used area drains throughout the site to collect stormwater. A deep trench was cut to pipe everything out to the street. The drainage connection uses a circle to rectangle adapter, finishing with a rectangular steel pipe that outlets through the curbface.
Project Progress
May 2026
Initial Assessment
Existing conditions documented. Topography analyzed. Grading plans, excavation plans, and erosion control plans in development.
June 2026
Submittal
Grading plans, excavation plans, and erosion control plans submitted to LADBS for review.
Plans
Need similar services?
We are currently accepting new projects in Pacific Palisades, Altadena, and Malibu for fire rebuild engineering.
Start Your Project