Grading plans, excavation plans, and drainage plans for a Pacific Palisades fire rebuild on a 12% slope with basement and garage level construction.

Grading plan for a Pacific Palisades hillside lot showing proposed grades, area drains, and drainage routing on a 12% slope street

Project Overview

Grading plans, excavation plans, and drainage plans for a Pacific Palisades fire rebuild on a steep 12% slope. The street itself is steep, which required careful design for the driveway apron connection to the basement and garage finished floor. The garage and basement sit on the same level with a lightwell behind the basement.

The first story of the new house sits roughly where the existing house was, tying into the existing grade closely. But the basement level required excavation deeper into the hillside.

We used area drains throughout the site to collect stormwater. A deep trench was cut to pipe everything out to the street. The drainage connection uses a circle to rectangle adapter, finishing with a rectangular steel pipe that outlets through the curbface.

Excavation plan showing basement and garage level construction on a steep Pacific Palisades lot with typical 2:1 slope shoring limits

Project Progress

May 2026

Initial Assessment

Existing conditions documented. Topography analyzed. Grading plans, excavation plans, and erosion control plans in development.

June 2026

Submittal

Grading plans, excavation plans, and erosion control plans submitted to LADBS for review.

Plans

Grading plan for a Pacific Palisades hillside lot showing proposed grades, area drains, and drainage routing on a 12% slope street
Excavation plan showing basement and garage level construction on a steep Pacific Palisades lot with typical 2:1 slope shoring limits