Los Angeles Grading & Drainage Project Portfolio

Since the January 2025 fires, we've been focused on helping Altadena, Pacific Palisades, and Malibu rebuild. Our portfolio showcases 51+ fire rebuild, residential, and commercial engineering projects across Los Angeles.

Fire Rebuild Projects

B+W Engineering Grading + Drainage Plans job-site banner on the chain-link fence at the Glenrose Avenue Altadena fire rebuild lot, with rough-graded dirt and the San Gabriel Mountains behind

Altadena Fire Rebuild on Glenrose Avenue

Altadena

Drainage plans, hydrology, and street plans for an Altadena fire rebuild: two-story house, attached ADU, 2-car garage, and pool.

Steep downslope Altadena fire rebuild lot on Northaven Lane looking toward valley with existing dry brush and chain link fence

Northaven Lane Drainage: Steep Downslope Lot

Altadena

Drainage plans and hydrology report for an Altadena fire rebuild on Northaven Lane. Steep downslope lot with single story house, rear deck, and separate parking pad.

Altadena Punahou Street fire rebuild lot above street level during initial site grading with concrete curb at street frontage and palm trees

Punahou Street Grading & Erosion Control

Altadena

Grading, erosion control, and street plans for an Altadena rebuild: house, attached garage and ADU, detached ADU, and pool on a lot above street level.

Pre-construction view of the Altadena W Mendocino Ave fire rebuild lot showing cleared site conditions

W Mendocino Ave Drainage & Hydrology

Altadena

Drainage plans and hydrology report for an Altadena fire rebuild — two-story house with cellar, rear garage with ADU, and a plastic-lined rain garden.

Construction site photo of the Altadena Punahou Street fire rebuild on a steep 200-foot lot, showing site conditions during grading and drainage work

Punahou Street Grading & Drainage Plans

Altadena

Drainage and hydrology for an Altadena rebuild on a 200-foot lot: no retaining walls, no sump pumps - existing topography, sheet flow, and lined rain gardens.

Grading plan for a Pacific Palisades hillside lot showing proposed grades, area drains, and drainage routing on a 12% slope street

Glenhaven Ave Grading & Drainage Plans

Pacific Palisades

Grading plans, excavation plans, and drainage plans for a Pacific Palisades fire rebuild on a 12% slope with basement and garage-level construction.

Construction site overview showing prepared building pad and drainage routing for Altadena fire rebuild

West Marigold St Drainage & Hydrology

Altadena

Drainage plans and hydrology for an Altadena fire rebuild with an 11-foot slope, ADU addition, and plastic-lined rain gardens on both sides. Approved May 2026.

Drainage plan for Altadena Olive Ave property showing proposed grading, flowlines, and spot elevations

Olive Avenue Drainage Plan

Altadena

Drainage plans for a 0.1685-acre Altadena fire rebuild lot. Sideways lot with 7% slope, sheet flow design.

Steep hillside with existing concrete retaining walls

Canon Boulevard Steep Hillside Grading

Altadena

Hillside Grading Plans for fire rebuild.

Newly placed white manufactured home on a graded dirt hillside lot in Altadena during an Eaton Fire rebuild, with a low concrete retaining wall, Sigalert construction sign, and a red mini skid steer

Las Flores Dr Drainage & Hydrology

Altadena

Drainage plan and hydrology for a 0.266-acre Las Flores fire rebuild: two manufactured homes on a 17% hillside, gravity flowlines, no sump pump. County approved.

Construction site photo of the Altadena multi-unit fire rebuild on Ganesha Avenue during grading and drainage work

Ganesha Ave Multi-Unit Drainage Plan

Altadena

Drainage plans, hydrology report, and street plans for a multi-unit Altadena Eaton Fire rebuild on a sideways lot with gravity drainage.

Pre-construction Altadena fire rebuild lot with Alto Builders sign and mountain views

West Harriet Street Drainage Plan

Altadena

Drainage plans for a 0.123-acre Altadena fire rebuild lot. Sheet flow design with area drains.

Altadena residential lot requiring drainage plan with Alto Builders sign indicating active construction

West Palm Street Drainage & Hydrology

Altadena

Drainage plan for a 0.1745-acre Altadena fire rebuild lot with 7-foot slope — sheet flow to lined rain gardens, no sump pump needed. Approved April 2026.

Pre-construction view of Altadena fire rebuild lot showing cleared dirt site with chain-link fencing, privacy screening, and construction materials

East Poppyfields Dr Drainage Plan

Altadena

Drainage plans and hydrology report for a 0.1795-acre Altadena fire rebuild lot. Sheet flow design eliminates need for sump pump.

Yellow Caterpillar wheel loader on Altadena construction site with mountain backdrop

Altadena Drainage Plan on West Mariposa Street

Altadena

Drainage plan for an Altadena Eaton Fire rebuild — existing conditions documented and stormwater flow designed across the lot. Completed April 2026.

Altadena lot after pool removal and rough grading with natural slope ready for new construction

Altadena Rough Grading Plan on East Pine Street

Altadena

Rough grading plan for a 0.4986-acre Altadena fire rebuild — the largest Altadena lot we've graded — with pool removal, 1:1 cut slopes, and 5:1 fill to daylight.

Altadena Marathon Road construction site featuring Scott J woodland materials

Marathon Road Drainage & Hydrology

Altadena

Drainage plan for a 0.13-acre Altadena Eaton Fire rebuild with a 10ft slope: area and trench drains to lined rain gardens, no sump pump. Under construction 2026.

Altadena residential lot with palm trees showing slope and natural drainage conditions

East Palm Ave Drainage & Hydrology Report

Altadena

Drainage plan for 0.199-acre Altadena lot with 13ft slope. Area drains to trench drain to lined rain garden, offset for sewer. 13-step rear deck.

Altadena single story construction with Eaton Fire sheet flow drainage design

Mount Curve Ave Grading & Hydrology

Altadena

Grading and hydrology for a like-for-like Eaton Fire rebuild - the second approved in Altadena and the first avoiding a sump pump via hydrology report.

Altadena construction site featuring guest house foundation with dual rain garden drainage design

Alta Crest Drive Drainage Plan

Altadena

First approved Altadena fire rebuild drainage plan from B+W. 0.2398-acre lot with 13ft slope, dual rain gardens, guest house and carport. Drainage plan only.

Concrete forming in progress for retaining wall with visible rebar reinforcement and black drainage pipe being installed through hillside slope on Altadena fire rebuild site

East Palm Street Drainage & Hydrology

Altadena

Full fire-rebuild plan set on East Palm Street in Altadena: drainage plans, hydrology report, stormwater sump pump design, and street plan for an Eaton Fire lot.

Altadena new home construction behind gated entrance featuring 1325-gallon underground fire tank

Marengo Ave Drainage Plan with Fire Tank

Altadena

Drainage plan for a 0.229-acre Altadena lot with a 1325-gallon underground fire tank: downspouts and trench drains to the tank, overflow to a lined rain garden.

Altadena lot showing erosion control with wattle and sandbags during rebuild

East Las Flores Dr Drainage Plan

Altadena

Drainage plan for 0.1768-acre corner lot in Altadena with 10ft slope. Flowline wraps house to Santa Anita Ave, max 5:1 slopes for drainage plan. Approved April 2026.

Pine Street drainage plan showing sheet flow design

Pine Street Drainage & Hydrology

Altadena

Drainage plans and hydrology for a single-family Altadena Eaton Fire rebuild: site assessment, existing drainage patterns, and gravity flow design. Approved.

Grading cross-sections for Pacific Palisades residence showing basement excavation and floor elevations

Chapala Drive Grading, Drainage & Excavation

Pacific Palisades

Grading plans, excavation plans, erosion control, and stormwater sump pump design for a single-family Pacific Palisades fire rebuild following the Palisades Fire.

Skywood Circle drainage plan for Altadena fire rebuild

Skywood Circle Drainage & Hydrology

Altadena

Drainage plans and hydrology report for a single-family Altadena Eaton Fire rebuild on Skywood Circle. Plans approved July 2026.

Altadena post-fire eroded terrain with concrete walkway showing drainage assessment

Wapello Street Drainage & Hydrology

Altadena

Drainage plans and hydrology report for a hillside single-family Altadena fire rebuild — the first of two B+W projects on Wapello Street.

Wapello Street earthwork exhibit for Altadena downslope fire rebuild

Wapello Street Drainage: Downslope Rebuild

Altadena

Drainage plans and hydrology for the second Wapello Street fire rebuild: a downslope Altadena lot with an existing pool and a property-line retaining wall.

Residential Projects

Full 3D terrain grading model of a Malibu hillside site in rainbow spectrum colors showing cut and fill volumes along the Pacific Coast Highway corridor

Malibu Hillside Grading on PCH

Malibu

Grading design for new construction on a vacant Malibu lot off PCH: 22% average slopes, 15% max fire access road on contours, balanced cut and fill in 3D.

A residential grading plan for 1708 Illinois Drive in South Pasadena showing proposed contours, spot elevations, and drainage routing exiting to Hanscom Drive via rectangular steel pipe

Illinois Drive Grading, Hydrology & Erosion

South Pasadena

Grading plans, hydrology report, and erosion control plans for a South Pasadena residential remodel — garage widening and drainage exit to Hanscom Drive.

Conceptual grading plan for Burbank Sunset Canyon Drive showing contours, flow arrows, and drainage patterns

Burbank SB9 Grading Plan on Sunset Canyon Drive

Burbank

Grading plans for a Burbank SB9 residential project — 34-foot slope over 300 feet with a 3-car garage at the bottom, conceptual plan for planning review.

Completed luxury residence on Alto Cedro Drive in Beverly Hills featuring cedar wood cladding, white stucco exterior, permeable paver motorcourt, concrete driveway, and professional landscaping

Alto Cedro Drive

Beverly Hills

Grading plans, stormwater sump pump, and LID design for a Beverly Hills residential remodel with permeable paver motorcourt and retaining walls.

Completed modern three-story white stucco residence on 18th Street Hermosa Beach with cantilevered facade, black-framed windows, wood garage door, and professional landscaping

18th Street

Hermosa Beach

C-Sheet (grading plan), LID, and stormwater sump pump design for a Hermosa Beach 3-story SFR with walk street front and alley rear.

Completed 3-story modern home on Marquez Terrace in Pacific Palisades with hillside grading and LID drainage

Marquez Terrace

Pacific Palisades

Grading plans, LID report, and excavation plans for a Pacific Palisades remodel: 2-story SFR with basement, existing pool stays, LID drainage to lined rain gardens.

Completed modern hillside residential project on St Lucia Avenue in Redondo Beach featuring two connected 2-story container homes with bridge, white stucco and brown textured panels, cantilevered balcony, concrete retaining walls, and drought-tolerant landscaping

St Lucia Avenue

Redondo Beach

Grading plans, hydrology report, and stormwater sump pump design for two connected 2-story container homes on a sloped Redondo Beach lot.

Modern residential entrance at 3523 Wrightwood Court with charcoal grey perimeter wall, Corten steel accent panel, glass driveway gate, and mature oak trees

Wrightwood Court

Studio City

Grading and LID design for Studio City residence. New 2-story house, pool, rain tanks, rain gardens, all drainage to curbface under sidewalk.

Mediterranean-style residence in Sherman Oaks with terracotta tile roof, stucco walls, gated driveway entrance, and mature landscaping

Alomar Drive

Sherman Oaks

Grading and excavation for steep hillside residence in Sherman Oaks. Proposed garage, deck, rec room below, rain garden, and permeable pavers.

Modern mid-century residence above the Sunset Strip with vertical wood batten siding, flagstone driveway, cedar gates, and mature landscaping

Devlin Drive

Los Angeles

Grading and LID design for Devlin Drive above Sunset Strip. New driveway, 2-story addition, pool deck, rain garden outlets to curbface.

Modern two-story residence in Redondo Beach with metal siding, wood slat cladding, xeriscaping, and paver driveway

Sapphire Street

Redondo Beach

Grading plan and stormwater sump pump for Redondo Beach residence. New garage, addition, rear deck, existing driveway remained.

Modern two-unit residential construction with stucco walls and metal roof in South Pasadena. Covered trellis parking structure in center with paver driveway

Orange Grove Place

South Pasadena

Grading and drainage for 2-unit residential in South Pasadena. 2% slope lot with LID planter boxes and trellis covered parking.

Civil engineering site grading and drainage plan for Vincent Park condo development in Redondo Beach showing proposed residence with basement and roof outlines, floor elevations, contour lines, drainage flow lines, and property improvements

Vincent Park

Redondo Beach

Grading plans, hydrology report, sump pump design, and erosion control plans for an irregular lot in Redondo Beach with slope to rear and 2 condos.

Completed two-story stucco house with a terracotta tile roof behind a concrete retaining wall and stepped entry path on the steep landscaped Redcliff Street hillside in Silver Lake

Silver Lake Hillside Grading on Redcliff St

Silver Lake

Grading plans and stormwater management for a steep Silver Lake hillside residence — new driveway entrance, 2:1 slopes, and two rain barrels.