AltadenaPlans Approved 2026

Altadena Drainage Plan & Hydrology Report on Wapello Street

Drainage plans and hydrology report for a single-family residential fire rebuild following the Eaton Fire.

Drainage plan for Altadena residence showing rain garden, flow elevations, and slope percentages

Location

Altadena, CA

Current Phase

Plans Approved 2026

Project Overview

Single-family residential fire rebuild in Altadena following the Eaton Fire. Site assessment completed with existing conditions documented and drainage patterns identified. Drainage plans and hydrology report developed to address how stormwater moves across the lot and where it needs to go.

Site Photos

Post-fire Altadena lot with eroded terrain and concrete walkway requiring drainage plan design
Graded Altadena lot ready for development with mature trees and drainage pattern assessment
Altadena residential site with existing concrete slab and mature trees before drainage plan construction
Existing concrete driveway at the Wapello Street Altadena fire rebuild lot looking toward brush pile, palm trees, and neighboring house under construction, used for drainage plan design
Existing driveway and cleared lot on Wapello Street in Altadena showing United Rentals porta potty, electrical meter, brush pile, and adjacent property access for drainage plan development

Project Progress

February 2026

Initial Assessment

Existing conditions documented. Drainage patterns identified.

2025

Submittal Stage

Drainage plans and hydrology report submitted to LA County for review.

2026

Plans Approved

Drainage plans and hydrology report approved by LA County.

Need similar services?

We are currently accepting new projects in Altadena, Pacific Palisades, and Malibu for fire rebuild engineering.

Start Your Project
Get Quote