AltadenaUnder Construction 2026

Altadena Drainage Plan & Hydrology Report on Marathon Road

Drainage plans and hydrology report for a single-family residential fire rebuild following the Eaton Fire.

Drainage plan for Altadena residence showing area drains, trench drain, and lined rain gardens with elevation contours

Location

Altadena, CA

Current Phase

Under Construction 2026

Project Overview

Single-family residential fire rebuild in Altadena following the Eaton Fire. The 0.1309-acre lot drops 10 feet from street to rear over 114 feet, requiring thoughtful grading to work with the natural slope. We used area drains at the front of the house and a trench drain in front of the attached garage, routing stormwater through gravity pipes into two separate plastic-lined rain gardens at the rear. Keeping slopes at or under 5:1 (20%) meant the project qualified as a drainage plan rather than a full grading plan, simplifying LA County approval. The hydrology report demonstrated that post-development stormwater flow would not exceed pre-fire conditions, eliminating the need for a sump pump.

The rear deck required 11 steps to accommodate the slope, and the design maximized the sideyard setback at 5 feet on both sides to make the most of the available area while meeting code requirements. The new single-story residential ties into the existing driveway which leads to the attached garage.

Site Photos

Altadena construction site showing floor joists on foundation with area drain placement for stormwater management
Altadena residential rebuild under construction with floor framing underway following our drainage plan design
Active construction on Altadena property featuring lumber and drainage material staging
Altadena construction site for residential rebuild with Scott J. Woodland Construction
Newly framed Altadena fire-rebuild house on a residential street corner behind a black mesh fence and blue Scott J. Woodland Construction sign, with wooden studs, OSB sheathing, black house wrap, and gray asphalt shingles over roof trusses, plus palm trees and hazy San Gabriel Mountains behind
Newly graded bare dirt lot at an Altadena fire-rebuild project in a suburban neighborhood, with bare hills and trees in the background under a clear blue sky
Altadena fire-rebuild house in structural framing phase on a bare dirt lot with a concrete stem wall foundation, OSB plywood sheathing, rough window openings, a partially shingled roof, and a white corrugated water tank in front

Project Progress

September 2025

Initial Assessment

Existing conditions documented. Drainage patterns analyzed. Hydrology study initiated.

November 2025

Submittal

Drainage plans and hydrology report submitted to LA County for review.

December 2025

Approved

Plans approved by LA County. Project cleared for construction.

Current

Under Construction

Construction has begun on the project.