Skip to main content
AltadenaFull Planset Submitted September 2026

Altadena Fire Rebuild on Glenrose Avenue

Drainage plans, hydrology report, and street plans for an Altadena fire rebuild on Glenrose Avenue. Two story house with attached single story ADU, attached 2-car garage, and pool.

Cut and fill drainage plan for Altadena Glenrose Avenue fire rebuild showing proposed 2-story house, ADU, garage, pool, area drains, and flowlines to the street

Location

Altadena, CA

Services

Current Phase

Full Planset Submitted September 2026

Project Overview

Single-family residential fire rebuild in Altadena following the Eaton Fire. This is our own property, so we are working through the same rebuild process our clients do, just with the bonus of putting our own design ideas to the test on a real lot.

The lot is relatively flat compared to most of what we work on in Altadena. Pre-fire, the existing grades sloped away from the street toward the rear of the lot, which is the opposite of what most LA County plan check wants to see. To handle that, we regraded about 85% of the lot to flow stormwater back to the front, then collected it with area drains routed to a parkway drain at the street. A hydrology report documents the pre-fire and post-development flows so we can keep the project outside the sump pump trigger.

The proposed design is a two story house with an attached single story ADU, attached two car garage, and a pool. Cut and fill earthwork was held to a minimum because the lot was already in a workable range. Drainage plans and street plans round out the scope that LA County reviews for submittal.

Builder + Designer: Living Water Ranches (Beth Carpenter)

Site Photos

Tree stump and root removal at the Glenrose Avenue Altadena fire rebuild site with a Deere 644K wheel loader and dirt piles during site clearing
Foundation trench excavation at the Glenrose Avenue Altadena fire rebuild with a Deere 544K wheel loader digging along the curb line
Soil compaction at the Glenrose Avenue Altadena fire rebuild lot with a Caterpillar sheepsfoot roller and Deere motor grader finishing the pad
Rough grading at the Glenrose Avenue Altadena fire rebuild lot with a Deere wheel loader and motor grader shaping the pad and flowlines
Freshly rough graded Glenrose Avenue lot in Altadena during fire rebuild, with B+W Engineering grading and drainage plans sign on construction fencing and San Gabriel Mountains behind
Cut and fill drainage plan for Altadena Glenrose Avenue fire rebuild showing proposed 2-story house, ADU, garage, pool, area drains, and flowlines to the street

Project Progress

2026

Initial Assessment

Existing conditions reviewed. Pre-fire rear-sloping topography analyzed. Drainage strategy developed to reverse flow to the front with minimal earthwork.

July 2026

Pre-Approval Planset Submitted

Drainage plans, hydrology report, and street plans submitted to LA County Planning for pre-approval review.

August 2026

Pre-Approval Granted

Planning pre-approval received from LA County.

September 2026

Full Planset Submitted to Building and Safety

Complete planset, including drainage plans, hydrology report, and street plans, submitted to LA County Building and Safety for plan check.

Need similar services?

We are currently accepting new projects in Altadena, Pacific Palisades, and Malibu for fire rebuild engineering.

Start Your Project
Get Quote