Pacific Palisades Grading Plan: 12% Slope, Basement Level, and Deep Trench Drainage
Grading plan for a Pacific Palisades hillside rebuild on a 12% slope. Garage and basement on same level with lightwell, area drains, and deep trench drainage to the street.
Read More