Skip to main content
Altadena Fire Rebuild Drainage Plans
by B+W Engineering

Altadena Fire Rebuild Drainage Plans

An Altadena fire rebuild drainage plan for a lot with a 10ft front-to-back drop and existing pool. We raise the house, re-grade the driveway, and add rain gardens to keep post-development Q similar to pre-fire levels.

Existing lot slope showing 10ft drop from front to back with existing pool and depression at rear

The existing Altadena cleared lot has a 10ft drop from front to back with an existing pool that will remain at the front yard. The rear of the lot has been cut out into a depression where the house used to sit. The existing driveway dropped down to the garage at 10% slope. We are going to tie this lot in with gravity sheetflow for stormwater towards the back to the pre-fire drainage pattern.

Proposed lot showing raised house, on-grade garage, and rain garden at rear

The proposed lot changes the driveway to be above the existing grade with about a 2% slope down to an on grade attached garage. The rest of the house will be raised off the ground. The walkway entrance door will have a new walkway directly to the street. The other exit from the house will blend into the existing pool deck. Flowlines will direct to a proposed landscaped area where we will sheetflow through a cutout to the driveway and flow down the proposed stairs. We are trying to pickup stormwater anywhere we can into landscape before hitting the rear so the drainage pattern becomes better than pre-fire. At the back of the lot we will place plastic lined rain gardens to help keep some more stormwater on site. The overall post Q will be about the same as pre Q while trying to keep some stormwater on site.

If you have questions about your Altadena fire rebuild or need drainage plans for your property, give us a call. We are happy to look at your site and give you an idea of what to expect.

323-739-3913 Get Quote