
Drainage Plans in Altadena Fire Rebuild
A corner-lot Altadena fire rebuild keeping the house in a similar location, adjusting contours to hold 5% slope 10 feet from the structure.
Read MoreTag
Posts tagged with "corner lot". 1 post on this topic from our Los Angeles civil engineering practice.

A corner-lot Altadena fire rebuild keeping the house in a similar location, adjusting contours to hold 5% slope 10 feet from the structure.
Read More