Altadena Fire Rebuild Drainage Plans Continue to Go Out
Still working with LA County on Altadena drainage approvals. Plan check asked to move plastic lined rain gardens 5 feet off property lines.

A bit of back and forth still with LA County with our creative solutions to getting Altadena drainage plans approved. Plan check wanted some minor modifications which is fair enough to bring the plastic lined rain gardens 5 feet off the property lines and make sure everything is compliant.
We’ve been working hard to streamline the Altadena fire rebuild drainage plan process. Our approach focuses on keeping existing drainage patterns to avoid stormwater sump pumps, which are expensive and require street plans. By using plastic lined rain gardens at low points, we can handle stormwater on-site more economically.
The key to our success has been careful attention to property line setbacks and ensuring all drainage features meet County requirements. We’ve found that proactively addressing potential issues in the initial design saves time and reduces costly revisions later in the process.
Related Posts

Rebuilding Altadena
The first Altadena lot since the Eaton Fire sold on Calaveras Street for $100k over asking. What that means for rebuild timing and engineering.
Altadena and SB9
Was doing some networking this week and getting to chit chat with Architects and developers about the fires has been most interesting.

Grading & Drainage Solutions for Altadena's Terrain
Altadena's flatter terrain brings different grading and drainage challenges than LA's steep hillside lots. Here's what works on these lots.