
Two Altadena Fire Rebuilds Just Poured Their Foundations
East Las Flores Drive and East Palm Street, two Altadena fire rebuilds, went from drawings to concrete. What each drainage design means for the lot.
Read MoreTag
Posts tagged with "construction". 3 posts on this topic from our Los Angeles civil engineering practice.

East Las Flores Drive and East Palm Street, two Altadena fire rebuilds, went from drawings to concrete. What each drainage design means for the lot.
Read MoreA look at current construction costs for Altadena fire rebuilds, what goes into the pricing, and where engineering fits into the total budget.
Read More
What goes into a hillside grading plan in Los Angeles, why LA County requires them, and how B+W Engineering streamlines the process.
Read More